Skip to content
Belgrave Estates

品牌公寓 · Dubai, UAE

Damac

Branded residences with global operators · 成立年份 2002

Operator-branded portfolio (Cavalli, de GRISOGONO, Trump). Strong off-plan velocity; resale liquidity varies by tower. Best in class for branded-residence pipelines in the GCC.

已完工项目

—

在建项目

—

覆盖市场

5

成立年限

24

1 live

Damac 在售项目。

目前正在向私人买家推介的期房项目。

  • Cavalli Tower — image 1Cavalli Tower — image 2 LiveHandover Q4 2025

    Dubai Marina

    Cavalli Tower

    Branded by Roberto Cavalli — duplex sky-villas at the top.

    Units
    700
    Beds
    1–5 bed
    Size
    780–4,900 sqft
    From
    $545k
    Payment
    60/40
    • Cavalli interiors
    • Private beach
    • Infinity pool
    Reference scheme

已完工项目

他们实际建成了什么。

精选已完工项目。如有兴趣,可应要求匹配这些楼盘的二手房源。

  • Damac Hills 2 — image 1Damac Hills 2 — image 2Completed 2022

    Dubailand

    Damac Hills 2

    Master community with golf course adjacency — strong family demographic.

    Units
    4,000
    Beds
    3–6 bed villas
    Reference scheme
  • Aykon City — image 1Completed 2024

    Sheikh Zayed Road

    Aykon City

    Four-tower mixed-use scheme with hotel-managed residences.

    Units
    3,000
    Beds
    Studio–3 bed
    Reference scheme

销售速度

项目清盘速度。

数据来自最近五次名录内的发售活动。

平均售罄时间

78 days

认购定金

20%

最近发售的认购率

88%

发售后取消率

4.6%

设计与建造合作方

他们的合作伙伴。

近期及在建项目中的标志性合作方。

  • Roberto Cavalli

    Brand & interiors

  • de GRISOGONO

    Brand & interiors

  • Versace Home

    Brand & interiors

近期动态

过去十二个月。

  1. Cavalli Tower nears topping-out

    交付

  2. Branded residence partnership extended with Cavalli

    媒体

  3. Damac Hills 2 final phase released

    发售

画册与下载

获取资料。

The desk maintains a PDF brochure pack on Damac — recent launches, payment-plan structures, comparable resale data, and a snag-quality summary across recent handovers.

预约实地参观

在认购期房前,先实地参观一个已完工项目。

我们安排参观同一开发商已完工的楼盘,让您亲眼看到成品。

市场

Damac 的开发市场。

Common questions

About buying from Damac.

Not what you needed? The off-plan desk replies within one business day.

  • What is Damac's on-time delivery record?

    On-time delivery is measured against the original brochure handover date; the figure is republished on each project page after handover. The desk has access to the granular delay history per scheme.

  • What sort of payment plans do they offer?

    Off-plan payment plans typically run 60/40 (60% during construction, 40% on handover) or 70/30. Branded-residence schemes sometimes carry a 30/70 plan (lower construction-stage burden, larger handover slug). The desk pre-screens the plan against your liquidity profile before launch.

  • Where does escrow sit?

    In the UAE, off-plan deposits sit in a project escrow account at one of the regulated banks (Emirates NBD, Mashreq, ENBD CAPITAL etc.) administered by DLD. The developer can only draw against verified construction milestones. RERA tracks every withdrawal.

  • Can I view a completed building before committing off-plan?

    Yes. We can arrange a viewing of the closest equivalent to the off-plan you're considering, ideally a building that's been handed over and lived in for 12+ months so you can see how it ages.

  • What if the developer delays handover?

    Standard developer SPA clauses include compensation triggered after 12 months of cumulative delay; the desk negotiates harder terms (penalties from month 6) on schemes where our buyer pool represents a large share of allocation.

Ready when you are

想提前了解 Damac 的项目?

期房团队在发售前 2 至 6 周向合格买家提供预发售推介。

  • No obligation, ever
  • A personal reply within one working day
  • One named senior partner throughout

Private and discreet. Your details are never sold, shared or added to a marketing list.