

LiveHandover Q3 2026MBR City
Sobha One
Five-tower waterfront with private golf course access.
- Units
- 2,800
- Beds
- 1–4 bed
- Size
- 560–2,900 sqft
- From
- $410k
- Payment
- 60/40
- Private golf
- Skybridge pool
- Concierge
Promoteur principal · Dubai, UAE
Build quality, backward-integrated supply chain · Fondé en 1976
Backward-integrated build platform from concrete to joinery — frequently cited as the build-quality leader in its band. Smaller pipeline but tight delivery cadence and a defensive resale profile.
Programmes livrés
—
En pipeline
—
Marchés desservis
3
Années d'existence
50
1 live
Les projets off-plan actuellement présentés à des acquéreurs privés.


LiveHandover Q3 2026MBR City
Five-tower waterfront with private golf course access.
Portefeuille livré
Une sélection de programmes livrés. L'inventaire de revente dans ces immeubles est mis en relation sur demande.

Completed 2021MBR City
Low-rise gardens-led scheme — cited build-quality benchmark for the band.
Distinctions
Best Build Quality
International Property Awards · 2024
Vitesse de vente
Basée sur les cinq lancements panel les plus récents.
Délai moyen de commercialisation
28 days
Dépôt de réservation
10%
Taux de vente au lancement récent
99%
Taux d'annulation post-lancement
1.8%
Partenaires conception & construction
Les collaborateurs de référence sur les programmes récents et en cours.
P&T Group
Architecture
WATG
Master-planning
Activité récente
Sobha One Tower B sells out in 11 days
Lancement
International Property Awards: Best Build Quality
Distinction
Brochures & téléchargements
The desk maintains a PDF brochure pack on Sobha Realty — recent launches, payment-plan structures, comparable resale data, and a snag-quality summary across recent handovers.
Planifier une visite de site
Nous organisons la visite d'un immeuble livré par la même famille d'opérateurs afin que vous puissiez voir le produit fini.
Marchés
Common questions
Not what you needed? The off-plan desk replies within one business day.
On-time delivery is measured against the original brochure handover date; the figure is republished on each project page after handover. The desk has access to the granular delay history per scheme.
Off-plan payment plans typically run 60/40 (60% during construction, 40% on handover) or 70/30. Branded-residence schemes sometimes carry a 30/70 plan (lower construction-stage burden, larger handover slug). The desk pre-screens the plan against your liquidity profile before launch.
In the UAE, off-plan deposits sit in a project escrow account at one of the regulated banks (Emirates NBD, Mashreq, ENBD CAPITAL etc.) administered by DLD. The developer can only draw against verified construction milestones. RERA tracks every withdrawal.
Yes. We can arrange a viewing of the closest equivalent to the off-plan you're considering, ideally a building that's been handed over and lived in for 12+ months so you can see how it ages.
Standard developer SPA clauses include compensation triggered after 12 months of cumulative delay; the desk negotiates harder terms (penalties from month 6) on schemes where our buyer pool represents a large share of allocation.
Sur le panel
Dubai, UAE
Master-developer of Downtown Dubai with consistent secondary-market liquidity. Long delivery record at scale; transparent payment-plan structures and DLD escrow on every off-plan launch.
OuvrirDubai, UAE
Operator-branded portfolio (Cavalli, de GRISOGONO, Trump). Strong off-plan velocity; resale liquidity varies by tower. Best in class for branded-residence pipelines in the GCC.
OuvrirAbu Dhabi, UAE
Abu Dhabi master-developer behind the Saadiyat cultural quarter (Louvre Abu Dhabi, Guggenheim under construction) and Yas Island residential. Strongest on island-master plans and government-grade infrastructure delivery.
OuvrirReady when you are
Le desk off-plan informe les acquéreurs qualifiés 2 à 6 semaines avant le lancement.
Private and discreet. Your details are never sold, shared or added to a marketing list.