

LiveHandover Q3 2026MBR City
Sobha One
Five-tower waterfront with private golf course access.
- Units
- 2,800
- Beds
- 1–4 bed
- Size
- 560–2,900 sqft
- From
- $410k
- Payment
- 60/40
- Private golf
- Skybridge pool
- Concierge
Master-Entwickler · Dubai, UAE
Build quality, backward-integrated supply chain · Gegründet 1976
Backward-integrated build platform from concrete to joinery — frequently cited as the build-quality leader in its band. Smaller pipeline but tight delivery cadence and a defensive resale profile.
Fertiggestellte Projekte
—
In der Pipeline
—
Bediente Märkte
3
Jahre seit Gründung
50
1 live
Die Off-Plan-Projekte, die derzeit Privatkäufern vorgestellt werden.


LiveHandover Q3 2026MBR City
Five-tower waterfront with private golf course access.
Fertiggestelltes Portfolio
Eine Auswahl fertiggestellter Projekte. Wiederverkaufsbestand in diesen Gebäuden wird auf Anfrage zugeordnet.

Completed 2021MBR City
Low-rise gardens-led scheme — cited build-quality benchmark for the band.
Auszeichnungen
Best Build Quality
International Property Awards · 2024
Verkaufsgeschwindigkeit
Basierend auf den fünf jüngsten Panel-Markteinführungen.
Ø Dauer bis Ausverkauf
28 days
Reservierungsanzahlung
10%
Verkaufsquote nach Markteinführung
99%
Stornierungsrate nach Markteinführung
1.8%
Design- & Baupartner
Die wichtigsten Kooperationspartner bei aktuellen und laufenden Projekten.
P&T Group
Architecture
WATG
Master-planning
Neueste Aktivitäten
Sobha One Tower B sells out in 11 days
Markteinführung
International Property Awards: Best Build Quality
Auszeichnung
Broschüren + Downloads
The desk maintains a PDF brochure pack on Sobha Realty — recent launches, payment-plan structures, comparable resale data, and a snag-quality summary across recent handovers.
Besichtigung vereinbaren
Wir organisieren Besichtigungen eines fertiggestellten Gebäudes derselben Betreiberfamilie, damit Sie das Endprodukt sehen können.
Märkte
Common questions
Not what you needed? The off-plan desk replies within one business day.
On-time delivery is measured against the original brochure handover date; the figure is republished on each project page after handover. The desk has access to the granular delay history per scheme.
Off-plan payment plans typically run 60/40 (60% during construction, 40% on handover) or 70/30. Branded-residence schemes sometimes carry a 30/70 plan (lower construction-stage burden, larger handover slug). The desk pre-screens the plan against your liquidity profile before launch.
In the UAE, off-plan deposits sit in a project escrow account at one of the regulated banks (Emirates NBD, Mashreq, ENBD CAPITAL etc.) administered by DLD. The developer can only draw against verified construction milestones. RERA tracks every withdrawal.
Yes. We can arrange a viewing of the closest equivalent to the off-plan you're considering, ideally a building that's been handed over and lived in for 12+ months so you can see how it ages.
Standard developer SPA clauses include compensation triggered after 12 months of cumulative delay; the desk negotiates harder terms (penalties from month 6) on schemes where our buyer pool represents a large share of allocation.
Im Panel
Dubai, UAE
Master-developer of Downtown Dubai with consistent secondary-market liquidity. Long delivery record at scale; transparent payment-plan structures and DLD escrow on every off-plan launch.
ÖffnenDubai, UAE
Operator-branded portfolio (Cavalli, de GRISOGONO, Trump). Strong off-plan velocity; resale liquidity varies by tower. Best in class for branded-residence pipelines in the GCC.
ÖffnenAbu Dhabi, UAE
Abu Dhabi master-developer behind the Saadiyat cultural quarter (Louvre Abu Dhabi, Guggenheim under construction) and Yas Island residential. Strongest on island-master plans and government-grade infrastructure delivery.
ÖffnenReady when you are
Der Off-Plan-Desk informiert qualifizierte Käufer 2 bis 6 Wochen vor der Markteinführung.
Private and discreet. Your details are never sold, shared or added to a marketing list.