

LiveHandover Q2 2026Dubai Creek Harbour
Creek Beach
Master-community beachfront on the Creek — pipeline through 2027.
- Units
- 1,100
- Beds
- 1–3 bed
- Size
- 710–2,120 sqft
- From
- $460k
- Payment
- 80/20
- Beach access
- Pool deck
- Yacht club
- + 1 more
Promotor principal · Dubai, UAE
Downtown Dubai · Beachfront · Arabian Ranches · Fundado 1997
Master-developer of Downtown Dubai with consistent secondary-market liquidity. Long delivery record at scale; transparent payment-plan structures and DLD escrow on every off-plan launch.
Promociones finalizadas
—
En proyecto
—
Mercados activos
5
Años de trayectoria
29
1 live
Los proyectos de obra nueva que se están presentando actualmente a compradores privados.


LiveHandover Q2 2026Dubai Creek Harbour
Master-community beachfront on the Creek — pipeline through 2027.
Cartera finalizada
Una selección de promociones finalizadas. El inventario de reventa en estos edificios se conecta bajo solicitud.


Completed 2010Downtown Dubai
Residences within the world's tallest building — owner profile skews ultra-prime resale.

Completed 2023Emaar Beachfront
Twin-tower beachfront residences with direct beach access — strong yield on short-let where permitted.

Completed 2020Downtown Dubai
Operator-branded duo (Address) — co-located with The Dubai Mall.
Reconocimiento
Forbes Top Regional Brand
Forbes Middle East · 2024
Best Master Developer
CityScape Awards · 2023
Velocidad de ventas
Basado en los cinco lanzamientos más recientes del panel.
Tiempo medio de agotamiento
42 days
Depósito de reserva
10%
Venta en lanzamiento reciente
97%
Tasa de cancelación tras lanzamiento
2.4%
Socios de diseño y construcción
Los colaboradores principales en promociones recientes y activas.
SOM
Architecture (Burj Khalifa)
Adrian Smith + Gordon Gill
Architecture
Yabu Pushelberg
Interiors (Address)
Actividad reciente
Creek Beach Phase 4 launched at Dubai Creek Harbour
Lanzamiento
Marina Vista handover ahead of brochure date
Entrega
Q1 2024 results: 38% YoY revenue growth
Prensa
Forbes Top Regional Brand 2024
Premio
Folletos y descargas
The desk maintains a PDF brochure pack on Emaar — recent launches, payment-plan structures, comparable resale data, and a snag-quality summary across recent handovers.
Programe una visita a la obra
Organizamos visitas a un edificio finalizado del mismo operador para que pueda ver el producto terminado.
Mercados
Common questions
Not what you needed? The off-plan desk replies within one business day.
On-time delivery is measured against the original brochure handover date; the figure is republished on each project page after handover. The desk has access to the granular delay history per scheme.
Off-plan payment plans typically run 60/40 (60% during construction, 40% on handover) or 70/30. Branded-residence schemes sometimes carry a 30/70 plan (lower construction-stage burden, larger handover slug). The desk pre-screens the plan against your liquidity profile before launch.
In the UAE, off-plan deposits sit in a project escrow account at one of the regulated banks (Emirates NBD, Mashreq, ENBD CAPITAL etc.) administered by DLD. The developer can only draw against verified construction milestones. RERA tracks every withdrawal.
Yes. We can arrange a viewing of the closest equivalent to the off-plan you're considering, ideally a building that's been handed over and lived in for 12+ months so you can see how it ages.
Standard developer SPA clauses include compensation triggered after 12 months of cumulative delay; the desk negotiates harder terms (penalties from month 6) on schemes where our buyer pool represents a large share of allocation.
En el panel
Dubai, UAE
Operator-branded portfolio (Cavalli, de GRISOGONO, Trump). Strong off-plan velocity; resale liquidity varies by tower. Best in class for branded-residence pipelines in the GCC.
AbrirDubai, UAE
Backward-integrated build platform from concrete to joinery — frequently cited as the build-quality leader in its band. Smaller pipeline but tight delivery cadence and a defensive resale profile.
AbrirAbu Dhabi, UAE
Abu Dhabi master-developer behind the Saadiyat cultural quarter (Louvre Abu Dhabi, Guggenheim under construction) and Yas Island residential. Strongest on island-master plans and government-grade infrastructure delivery.
AbrirReady when you are
El departamento de obra nueva informa a compradores cualificados de 2 a 6 semanas antes del lanzamiento.
Private and discreet. Your details are never sold, shared or added to a marketing list.