Skip to content
Belgrave Estates

Ana Geliştirici · Dubai, UAE

Emaar

Downtown Dubai · Beachfront · Arabian Ranches · Kuruluş 1997

Master-developer of Downtown Dubai with consistent secondary-market liquidity. Long delivery record at scale; transparent payment-plan structures and DLD escrow on every off-plan launch.

Tamamlanan projeler

—

Pipeline'da

—

Hizmet verilen pazarlar

5

Kuruluş yılı

29

1 live

Emaar ile aktif projeler.

Şu anda özel alıcılara sunulan plan dışı projeler.

  • Creek Beach — image 1Creek Beach — image 2Creek Beach — image 3 LiveHandover Q2 2026

    Dubai Creek Harbour

    Creek Beach

    Master-community beachfront on the Creek — pipeline through 2027.

    Units
    1,100
    Beds
    1–3 bed
    Size
    710–2,120 sqft
    From
    $460k
    Payment
    80/20
    • Beach access
    • Pool deck
    • Yacht club
    • + 1 more
    Reference scheme

Tamamlanan portföy

Gerçekte ne inşa ettiler.

Tamamlanmış projelerden bir seçki. Bu binalardaki ikinci el envanter talep üzerine eşleştirilir.

  • Burj Khalifa Residences — image 1Burj Khalifa Residences — image 2Burj Khalifa Residences — image 3Completed 2010

    Downtown Dubai

    Burj Khalifa Residences

    Residences within the world's tallest building — owner profile skews ultra-prime resale.

    Units
    900
    Beds
    1–4 bed
    Reference scheme
  • Marina Vista — image 1Marina Vista — image 2Completed 2023

    Emaar Beachfront

    Marina Vista

    Twin-tower beachfront residences with direct beach access — strong yield on short-let where permitted.

    Units
    384
    Beds
    1–4 bed
    Reference scheme
  • Address Sky View — image 1Address Sky View — image 2Completed 2020

    Downtown Dubai

    Address Sky View

    Operator-branded duo (Address) — co-located with The Dubai Mall.

    Units
    532
    Beds
    1–4 bed
    Reference scheme

Tanınma

Ödüller ve takdirler.

  • Forbes Top Regional Brand

    Forbes Middle East · 2024

  • Best Master Developer

    CityScape Awards · 2023

Satış hızı

Projeleri ne hızla tükeniyor.

En son beş panel lansmanından derlenir.

Ort. tükenme süresi

42 days

Rezervasyon depozitosu

10%

Son lansman satış oranı

97%

Lansman sonrası iptal oranı

2.4%

Tasarım ve inşaat ortakları

Kimlerle çalışıyorlar.

Güncel ve aktif projelerdeki imza iş birlikleri.

  • SOM

    Architecture (Burj Khalifa)

  • Adrian Smith + Gordon Gill

    Architecture

  • Yabu Pushelberg

    Interiors (Address)

Son faaliyetler

Son on iki ayda.

  1. Creek Beach Phase 4 launched at Dubai Creek Harbour

    Lansman

  2. Marina Vista handover ahead of brochure date

    Teslim

  3. Q1 2024 results: 38% YoY revenue growth

    Basın

  4. Forbes Top Regional Brand 2024

    Ödül

Broşürler ve indirmeler

Dosyayı alın.

The desk maintains a PDF brochure pack on Emaar — recent launches, payment-plan structures, comparable resale data, and a snag-quality summary across recent handovers.

Saha ziyareti planlayın

Plan dışı taahhüt vermeden önce tamamlanmış bir projeyi görün.

Aynı işletmeci ailesinden tamamlanmış bir binayı gezmenizi sağlarız; böylece bitmiş ürünü görebilirsiniz.

Pazarlar

Emaar nerede inşa ediyor.

Common questions

About buying from Emaar.

Not what you needed? The off-plan desk replies within one business day.

  • What is Emaar's on-time delivery record?

    On-time delivery is measured against the original brochure handover date; the figure is republished on each project page after handover. The desk has access to the granular delay history per scheme.

  • What sort of payment plans do they offer?

    Off-plan payment plans typically run 60/40 (60% during construction, 40% on handover) or 70/30. Branded-residence schemes sometimes carry a 30/70 plan (lower construction-stage burden, larger handover slug). The desk pre-screens the plan against your liquidity profile before launch.

  • Where does escrow sit?

    In the UAE, off-plan deposits sit in a project escrow account at one of the regulated banks (Emirates NBD, Mashreq, ENBD CAPITAL etc.) administered by DLD. The developer can only draw against verified construction milestones. RERA tracks every withdrawal.

  • Can I view a completed building before committing off-plan?

    Yes. We can arrange a viewing of the closest equivalent to the off-plan you're considering, ideally a building that's been handed over and lived in for 12+ months so you can see how it ages.

  • What if the developer delays handover?

    Standard developer SPA clauses include compensation triggered after 12 months of cumulative delay; the desk negotiates harder terms (penalties from month 6) on schemes where our buyer pool represents a large share of allocation.

Ready when you are

Emaar hakkında ön lansman brifing mi?

Plan dışı masası, nitelikli alıcılara lansmanlardan 2–6 hafta önce brifing verir.

  • No obligation, ever
  • A personal reply within one working day
  • One named senior partner throughout

Private and discreet. Your details are never sold, shared or added to a marketing list.