Skip to content
Belgrave Estates

Master Developer · Dubai, UAE

Emaar

Downtown Dubai · Beachfront · Arabian Ranches · Established 1997

Master-developer of Downtown Dubai with consistent secondary-market liquidity. Long delivery record at scale; transparent payment-plan structures and DLD escrow on every off-plan launch.

Completed schemes

86+

In pipeline

14

Markets served

5

Years established

29

1 live

Live with Emaar.

The off-plan projects currently being introduced to private buyers. Tap a card for the full details and to register interest before public release.

  • Creek Beach — image 1Creek Beach — image 2Creek Beach — image 3 LiveHandover Q2 2026

    Dubai Creek Harbour

    Creek Beach

    Master-community beachfront on the Creek — pipeline through 2027.

    Units
    1,100
    Beds
    1–3 bed
    Size
    710–2,120 sqft
    From
    $460k
    Payment
    80/20
    • Beach access
    • Pool deck
    • Yacht club
    • + 1 more
    Reference scheme

Completed portfolio

What they've actually built.

A selection of completed schemes. Resale inventory in these buildings is matched on request.

  • Burj Khalifa Residences — image 1Burj Khalifa Residences — image 2Burj Khalifa Residences — image 3Completed 2010

    Downtown Dubai

    Burj Khalifa Residences

    Residences within the world's tallest building — owner profile skews ultra-prime resale.

    Units
    900
    Beds
    1–4 bed
    Reference scheme
  • Marina Vista — image 1Marina Vista — image 2Completed 2023

    Emaar Beachfront

    Marina Vista

    Twin-tower beachfront residences with direct beach access — strong yield on short-let where permitted.

    Units
    384
    Beds
    1–4 bed
    Reference scheme
  • Address Sky View — image 1Address Sky View — image 2Completed 2020

    Downtown Dubai

    Address Sky View

    Operator-branded duo (Address) — co-located with The Dubai Mall.

    Units
    532
    Beds
    1–4 bed
    Reference scheme

Recognition

Awards and recognitions.

  • Forbes Top Regional Brand

    Forbes Middle East · 2024

  • Best Master Developer

    CityScape Awards · 2023

Sales velocity

How fast their schemes clear.

Drawn from the most recent five panel launches. Includes the typical reservation deposit and post-launch cancellation rate.

Avg time to sell out

42 days

Reservation deposit

10%

Recent launch sell-through

97%

Post-launch cancel rate

2.4%

Verified buyer reviews

What buyers actually say about Emaar.

Verified at handover or 12 months post-handover. Names abbreviated; full transcripts on the desk.

  • Best decision was buying off-plan in Beachfront

    Handover happened two weeks ahead of the brochure date. Snag list was minor and resolved within a fortnight. Resale comparables 14 months in were c. 22% above purchase.

    Hala K.Marina Vista
  • Tight escrow, transparent payment plan

    DLD drawdowns were visible on the e-mart at every milestone. No surprises, no late fees added.

    Ahmed S.Burj Khalifa Residences
  • Strong product, parking layout could be better

    Building feels premium throughout. The only friction is the parking allocation system at peak hours.

    Sara N.Address Sky View

Design & build partners

Who they work with.

The signature collaborators on recent + active schemes. A useful proxy for design pedigree across the portfolio.

  • SOM

    Architecture (Burj Khalifa)

  • Adrian Smith + Gordon Gill

    Architecture

  • Yabu Pushelberg

    Interiors (Address)

Recent activity

In the last twelve months.

Launches, handovers, awards and notable press from the recent reporting window.

  1. Creek Beach Phase 4 launched at Dubai Creek Harbour

    Launch

  2. Marina Vista handover ahead of brochure date

    Handover

  3. Q1 2024 results: 38% YoY revenue growth

    Press

  4. Forbes Top Regional Brand 2024

    Award

Brochures + downloads

Get the deck.

The desk maintains a PDF brochure pack on Emaar — recent launches, payment-plan structures, comparable resale data, and a snag-quality summary across recent handovers.

Schedule a site visit

See a completed scheme before you commit off-plan.

We arrange viewings of a completed building from the same operator family so you can see the finished product, the lobby, and how the development ages in occupancy.

Markets

Where Emaar builds.

Tap a country to see the live and completed inventory we surface there.

Common questions

About buying from Emaar.

Not what you needed? The off-plan desk replies within one business day.

  • What is Emaar's on-time delivery record?

    Emaar has handed over 86 schemes since 1997. On-time delivery is measured against the original brochure handover date; the figure is republished on each project page after handover. The desk has access to the granular delay history per scheme.

  • What sort of payment plans do they offer?

    Off-plan payment plans typically run 60/40 (60% during construction, 40% on handover) or 70/30. Branded-residence schemes sometimes carry a 30/70 plan (lower construction-stage burden, larger handover slug). The desk pre-screens the plan against your liquidity profile before launch.

  • Where does escrow sit?

    In the UAE, off-plan deposits sit in a project escrow account at one of the regulated banks (Emirates NBD, Mashreq, ENBD CAPITAL etc.) administered by DLD. The developer can only draw against verified construction milestones. RERA tracks every withdrawal.

  • Can I view a completed building before committing off-plan?

    Yes. Emaar has 86 completed schemes; we can arrange a viewing of the closest equivalent to the off-plan you're considering, ideally a building that's been handed over and lived in for 12+ months so you can see how it ages.

  • What if the developer delays handover?

    Standard developer SPA clauses include compensation triggered after 12 months of cumulative delay; the desk negotiates harder terms (penalties from month 6) on schemes where our buyer pool represents a large share of allocation.

Ready when you are

A pre-release brief on Emaar?

The off-plan desk briefs qualified buyers 2-6 weeks before launch — discreet previews, allocation discipline.