Skip to content
Belgrave Estates

Government / Sovereign-backed · Riyadh, KSA

Roshn

PIF-backed master communities · Established 2020

PIF-backed Saudi master-developer delivering integrated communities under Vision 2030. Government backing, long horizon, increasingly visible in off-plan KSA inventory.

Completed schemes

4+

In pipeline

9

Markets served

1

Years established

6

1 live

Live with Roshn.

The off-plan projects currently being introduced to private buyers. Tap a card for the full details and to register interest before public release.

  • Sedra — image 1Sedra — image 2 LiveHandover Rolling

    Riyadh

    Sedra

    Vision-2030 master community north of Riyadh — schools, mosques, retail integrated.

    Units
    30,000
    Beds
    3–5 bed villas
    Size
    1,900–4,400 sqft
    From
    $320k
    Payment
    Cash + finance
    • Schools
    • Mosques
    • Retail spine
    • + 1 more
    Reference scheme

Brochures + downloads

Get the deck.

The desk maintains a PDF brochure pack on Roshn — recent launches, payment-plan structures, comparable resale data, and a snag-quality summary across recent handovers.

Schedule a site visit

See a completed scheme before you commit off-plan.

We arrange viewings of a completed building from the same operator family so you can see the finished product, the lobby, and how the development ages in occupancy.

Markets

Where Roshn builds.

Tap a country to see the live and completed inventory we surface there.

Common questions

About buying from Roshn.

Not what you needed? The off-plan desk replies within one business day.

  • What is Roshn's on-time delivery record?

    Roshn has handed over 4 schemes since 2020. On-time delivery is measured against the original brochure handover date; the figure is republished on each project page after handover. The desk has access to the granular delay history per scheme.

  • What sort of payment plans do they offer?

    Off-plan payment plans typically run 60/40 (60% during construction, 40% on handover) or 70/30. Branded-residence schemes sometimes carry a 30/70 plan (lower construction-stage burden, larger handover slug). The desk pre-screens the plan against your liquidity profile before launch.

  • Where does escrow sit?

    Escrow practice varies by market. The desk briefs you on the specific protection in place for each scheme before you commit.

  • Can I view a completed building before committing off-plan?

    Yes. Roshn has 4 completed schemes; we can arrange a viewing of the closest equivalent to the off-plan you're considering, ideally a building that's been handed over and lived in for 12+ months so you can see how it ages.

  • What if the developer delays handover?

    Standard developer SPA clauses include compensation triggered after 12 months of cumulative delay; the desk negotiates harder terms (penalties from month 6) on schemes where our buyer pool represents a large share of allocation.

Ready when you are

A pre-release brief on Roshn?

The off-plan desk briefs qualified buyers 2-6 weeks before launch — discreet previews, allocation discipline.