Skip to content
Belgrave Estates

Master Developer · London, UK

Berkeley Group

Long-cycle London regeneration · Established 1976

Long-cycle regeneration in London (Battersea adjacent, Royal Arsenal, King's Road) and the Home Counties. NHBC-protected; defensive resale brand among UK developers. Highest weighting in our UK panel.

Completed schemes

110+

In pipeline

12

Markets served

1

Years established

50

1 live

Live with Berkeley Group.

The off-plan projects currently being introduced to private buyers. Tap a card for the full details and to register interest before public release.

  • TwelveTrees Park — image 1TwelveTrees Park — image 2TwelveTrees Park — image 3 LiveHandover Q1 2026

    London E15

    TwelveTrees Park

    West Ham regeneration — Elizabeth line station, 12-acre park.

    Units
    3,800
    Beds
    1–3 bed
    Size
    510–1,350 sqft
    From
    $720k
    Payment
    10% / 10% / 80%
    • Elizabeth line
    • 12-acre park
    • Concierge
    • + 1 more
    Reference scheme

Completed portfolio

What they've actually built.

A selection of completed schemes. Resale inventory in these buildings is matched on request.

  • Royal Arsenal Riverside — image 1Royal Arsenal Riverside — image 2Royal Arsenal Riverside — image 3Completed 2023

    London SE18

    Royal Arsenal Riverside

    Long-cycle Woolwich regeneration with Crossrail station on-site.

    Units
    5,000
    Beds
    1–3 bed
    Reference scheme
  • Chelsea Creek — image 1Chelsea Creek — image 2Completed 2022

    London SW6

    Chelsea Creek

    Waterside scheme adjacent to Imperial Wharf — strong rental demographic.

    Units
    1,500
    Beds
    1–4 bed
    Reference scheme

Recognition

Awards and recognitions.

  • NHBC Top 100 Builder

    NHBC · 2024

  • Queen's Award for Sustainable Development

    HM The Queen · 2014

Sales velocity

How fast their schemes clear.

Drawn from the most recent five panel launches. Includes the typical reservation deposit and post-launch cancellation rate.

Avg time to sell out

210 days

Reservation deposit

10%

Recent launch sell-through

71%

Post-launch cancel rate

1.2%

Verified buyer reviews

What buyers actually say about Berkeley Group.

Verified at handover or 12 months post-handover. Names abbreviated; full transcripts on the desk.

  • NHBC + Berkeley = peace of mind

    Long-cycle delivery is exactly as advertised. 10-year warranty plus the Berkeley aftercare team make this category-defining for the UK.

    James E.Royal Arsenal Riverside
  • Slight delay but well-managed

    Crossrail interface caused a 3-month delay vs original timetable. Berkeley communicated weekly and gave us occupancy compensation.

    Priya M.Royal Arsenal Riverside

Design & build partners

Who they work with.

The signature collaborators on recent + active schemes. A useful proxy for design pedigree across the portfolio.

  • Allies and Morrison

    Architecture

  • Patel Taylor

    Architecture

  • Make

    Architecture

Recent activity

In the last twelve months.

Launches, handovers, awards and notable press from the recent reporting window.

  1. TwelveTrees Park Phase 2 launched

    Launch

  2. NHBC Top 100 Builder 2024

    Award

  3. Royal Arsenal Riverside final phase handover

    Handover

Brochures + downloads

Get the deck.

The desk maintains a PDF brochure pack on Berkeley Group — recent launches, payment-plan structures, comparable resale data, and a snag-quality summary across recent handovers.

Schedule a site visit

See a completed scheme before you commit off-plan.

We arrange viewings of a completed building from the same operator family so you can see the finished product, the lobby, and how the development ages in occupancy.

Markets

Where Berkeley Group builds.

Tap a country to see the live and completed inventory we surface there.

Common questions

About buying from Berkeley Group.

Not what you needed? The off-plan desk replies within one business day.

  • What is Berkeley Group's on-time delivery record?

    Berkeley Group has handed over 110 schemes since 1976. On-time delivery is measured against the original brochure handover date; the figure is republished on each project page after handover. The desk has access to the granular delay history per scheme.

  • What sort of payment plans do they offer?

    Off-plan payment plans typically run 60/40 (60% during construction, 40% on handover) or 70/30. Branded-residence schemes sometimes carry a 30/70 plan (lower construction-stage burden, larger handover slug). The desk pre-screens the plan against your liquidity profile before launch.

  • Where does escrow sit?

    In the UK, off-plan deposits are not held in escrow by default. We restrict the UK panel to NHBC-protected schemes with developers carrying multi-decade balance sheets; deposit protection is via contract trust arrangements with the solicitor.

  • Can I view a completed building before committing off-plan?

    Yes. Berkeley Group has 110 completed schemes; we can arrange a viewing of the closest equivalent to the off-plan you're considering, ideally a building that's been handed over and lived in for 12+ months so you can see how it ages.

  • What if the developer delays handover?

    Standard developer SPA clauses include compensation triggered after 12 months of cumulative delay; the desk negotiates harder terms (penalties from month 6) on schemes where our buyer pool represents a large share of allocation.

Ready when you are

A pre-release brief on Berkeley Group?

The off-plan desk briefs qualified buyers 2-6 weeks before launch — discreet previews, allocation discipline.