

LiveHandover Q1 2026London E15
TwelveTrees Park
West Ham regeneration — Elizabeth line station, 12-acre park.
- Units
- 3,800
- Beds
- 1–3 bed
- Size
- 510–1,350 sqft
- From
- $720k
- Payment
- 10% / 10% / 80%
- Elizabeth line
- 12-acre park
- Concierge
- + 1 more
Master Developer · London, UK
Long-cycle London regeneration · Established 1976
Long-cycle regeneration in London (Battersea adjacent, Royal Arsenal, King's Road) and the Home Counties. NHBC-protected; defensive resale brand among UK developers. Highest weighting in our UK panel.
Completed schemes
110+
In pipeline
12
Markets served
1
Years established
50
1 live
The off-plan projects currently being introduced to private buyers. Tap a card for the full details and to register interest before public release.


LiveHandover Q1 2026London E15
West Ham regeneration — Elizabeth line station, 12-acre park.
Completed portfolio
A selection of completed schemes. Resale inventory in these buildings is matched on request.


Completed 2023London SE18
Long-cycle Woolwich regeneration with Crossrail station on-site.

Completed 2022London SW6
Waterside scheme adjacent to Imperial Wharf — strong rental demographic.
Recognition
NHBC Top 100 Builder
NHBC · 2024
Queen's Award for Sustainable Development
HM The Queen · 2014
Sales velocity
Drawn from the most recent five panel launches. Includes the typical reservation deposit and post-launch cancellation rate.
Avg time to sell out
210 days
Reservation deposit
10%
Recent launch sell-through
71%
Post-launch cancel rate
1.2%
Verified buyer reviews
Verified at handover or 12 months post-handover. Names abbreviated; full transcripts on the desk.
NHBC + Berkeley = peace of mind
Long-cycle delivery is exactly as advertised. 10-year warranty plus the Berkeley aftercare team make this category-defining for the UK.
Slight delay but well-managed
Crossrail interface caused a 3-month delay vs original timetable. Berkeley communicated weekly and gave us occupancy compensation.
Design & build partners
The signature collaborators on recent + active schemes. A useful proxy for design pedigree across the portfolio.
Allies and Morrison
Architecture
Patel Taylor
Architecture
Make
Architecture
Recent activity
Launches, handovers, awards and notable press from the recent reporting window.
TwelveTrees Park Phase 2 launched
Launch
NHBC Top 100 Builder 2024
Award
Royal Arsenal Riverside final phase handover
Handover
Brochures + downloads
The desk maintains a PDF brochure pack on Berkeley Group — recent launches, payment-plan structures, comparable resale data, and a snag-quality summary across recent handovers.
Schedule a site visit
We arrange viewings of a completed building from the same operator family so you can see the finished product, the lobby, and how the development ages in occupancy.
Markets
Tap a country to see the live and completed inventory we surface there.
Common questions
Not what you needed? The off-plan desk replies within one business day.
Berkeley Group has handed over 110 schemes since 1976. On-time delivery is measured against the original brochure handover date; the figure is republished on each project page after handover. The desk has access to the granular delay history per scheme.
Off-plan payment plans typically run 60/40 (60% during construction, 40% on handover) or 70/30. Branded-residence schemes sometimes carry a 30/70 plan (lower construction-stage burden, larger handover slug). The desk pre-screens the plan against your liquidity profile before launch.
In the UK, off-plan deposits are not held in escrow by default. We restrict the UK panel to NHBC-protected schemes with developers carrying multi-decade balance sheets; deposit protection is via contract trust arrangements with the solicitor.
Yes. Berkeley Group has 110 completed schemes; we can arrange a viewing of the closest equivalent to the off-plan you're considering, ideally a building that's been handed over and lived in for 12+ months so you can see how it ages.
Standard developer SPA clauses include compensation triggered after 12 months of cumulative delay; the desk negotiates harder terms (penalties from month 6) on schemes where our buyer pool represents a large share of allocation.
On the panel
Dubai, UAE
Operator-branded portfolio (Cavalli, de GRISOGONO, Trump). Strong off-plan velocity; resale liquidity varies by tower. Best in class for branded-residence pipelines in the GCC.
OpenGlobal
Marriott's most premium hospitality flag. Butler service, hotel amenity access, and a globally recognised brand. Frequently the asking-price ceiling in markets it enters.
OpenReady when you are
The off-plan desk briefs qualified buyers 2-6 weeks before launch — discreet previews, allocation discipline.