Skip to content
Belgrave Estates

Master Developer · Abu Dhabi, UAE

Aldar

Yas Island · Saadiyat Cultural Quarter · Established 2004

Abu Dhabi master-developer behind the Saadiyat cultural quarter (Louvre Abu Dhabi, Guggenheim under construction) and Yas Island residential. Strongest on island-master plans and government-grade infrastructure delivery.

Completed schemes

38+

In pipeline

9

Markets served

2

Years established

22

1 live

Live with Aldar.

The off-plan projects currently being introduced to private buyers. Tap a card for the full details and to register interest before public release.

  • Saadiyat Reserve — image 1Saadiyat Reserve — image 2 LiveHandover Q2 2025

    Saadiyat Island

    Saadiyat Reserve

    Beachfront villas adjacent to the Louvre cultural district.

    Units
    320
    Beds
    3–7 bed villas
    Size
    3,800–9,200 sqft
    From
    $1.9M
    Payment
    60/40
    • Beach club
    • Wellness
    • Cultural quarter
    Reference scheme

Completed portfolio

What they've actually built.

A selection of completed schemes. Resale inventory in these buildings is matched on request.

  • Yas Acres — image 1Yas Acres — image 2Completed 2021

    Yas Island

    Yas Acres

    Villas and townhouses with Yas Marina access.

    Units
    1,100
    Beds
    2–5 bed
    Reference scheme

Sales velocity

How fast their schemes clear.

Drawn from the most recent five panel launches. Includes the typical reservation deposit and post-launch cancellation rate.

Avg time to sell out

56 days

Reservation deposit

10%

Recent launch sell-through

94%

Post-launch cancel rate

3.1%

Design & build partners

Who they work with.

The signature collaborators on recent + active schemes. A useful proxy for design pedigree across the portfolio.

  • Foster + Partners

    Architecture (Saadiyat)

  • Jean Nouvel

    Architecture

Recent activity

In the last twelve months.

Launches, handovers, awards and notable press from the recent reporting window.

  1. Saadiyat Reserve Phase 2 launched

    Launch

  2. Saadiyat Cultural District phase 1 handover begins

    Handover

Brochures + downloads

Get the deck.

The desk maintains a PDF brochure pack on Aldar — recent launches, payment-plan structures, comparable resale data, and a snag-quality summary across recent handovers.

Schedule a site visit

See a completed scheme before you commit off-plan.

We arrange viewings of a completed building from the same operator family so you can see the finished product, the lobby, and how the development ages in occupancy.

Markets

Where Aldar builds.

Tap a country to see the live and completed inventory we surface there.

Common questions

About buying from Aldar.

Not what you needed? The off-plan desk replies within one business day.

  • What is Aldar's on-time delivery record?

    Aldar has handed over 38 schemes since 2004. On-time delivery is measured against the original brochure handover date; the figure is republished on each project page after handover. The desk has access to the granular delay history per scheme.

  • What sort of payment plans do they offer?

    Off-plan payment plans typically run 60/40 (60% during construction, 40% on handover) or 70/30. Branded-residence schemes sometimes carry a 30/70 plan (lower construction-stage burden, larger handover slug). The desk pre-screens the plan against your liquidity profile before launch.

  • Where does escrow sit?

    In the UAE, off-plan deposits sit in a project escrow account at one of the regulated banks (Emirates NBD, Mashreq, ENBD CAPITAL etc.) administered by DLD. The developer can only draw against verified construction milestones. RERA tracks every withdrawal.

  • Can I view a completed building before committing off-plan?

    Yes. Aldar has 38 completed schemes; we can arrange a viewing of the closest equivalent to the off-plan you're considering, ideally a building that's been handed over and lived in for 12+ months so you can see how it ages.

  • What if the developer delays handover?

    Standard developer SPA clauses include compensation triggered after 12 months of cumulative delay; the desk negotiates harder terms (penalties from month 6) on schemes where our buyer pool represents a large share of allocation.

Ready when you are

A pre-release brief on Aldar?

The off-plan desk briefs qualified buyers 2-6 weeks before launch — discreet previews, allocation discipline.